Application User Guide
Agile Work Plan Generator
What Does This Tool Do?
The Agile Work Plan Generator application turns a Strategic Plan (often a narrative document) into a concrete, measurable Work Table (Work Plan), complete with Budget estimates and the human-resource Roles required.
This tool ensures that every activity is costed according to the Standard Unit Costs (SSB) set by GPI, so that your planning is accountable and realistic.
🚀 Step 1: Preparation and Data Input
1. Check the API Key (Already Automatic)
- You do not need to enter an API Key, because it is already configured automatically in the system.
2. Enter the Strategic Plan Document
You have two options for entering your Strategic Plan:
- Option A: Upload a PDF File: Click the "Upload Agile Strategic Plan (PDF)" button and select your Strategic Plan document.
- Option B: Paste Text: Copy and paste the entire contents of the Strategic Plan document (as narrative text) into the large "Teks Rencana Strategis" (Strategic Plan Text) box.
3. Review the Cost Standards (SBM/DKI)
- In the right-hand column (Section 2), you can see the list of cost standards already loaded into the system (for example: Speaker Fees, Full-Day Meeting Package, etc.).
- Important: The AI will use these standards to calculate the budget automatically.
4. The Generate Process
- Once the strategic document has been entered, click the large button:
GENERATE WORK PLAN - Wait a moment. The AI will read the strategy, break it down into small tasks, and link them to costs and work cycles (Sprints).
🛠️ Step 2: Review and Correct the Work Plan
Once the AI process is complete, the application will display two main tables at the bottom.
A. Agile Implementation Matrix (Work Plan)
This table is your day-to-day work plan. You can edit the data directly in the table cells.
Column | Function | How to Correct |
Sprint | The work cycle (2 weeks) for this task. | Click the cell and change the number. |
Strategic Task | The specific task to be carried out. | Click the cell and edit the task description. |
Resource Source | The implementing resource (Internal/GBM/Partner). | Click the dropdown and choose the correct resource. |
Budget Component (SSB) | The cost component used (e.g., Meeting Meals). | CLICK ON THE COMPONENT NAME to open a Modal (pop-up window) and choose another, more suitable cost standard. |
Vol | The Volume/Quantity of Cost Units required. | Click the cell and change the volume figure (e.g., from 1 to 10 OH). |
Unit | Cost Component Unit (OJP, OK, OH, Portion, Day, etc.). | Filled in automatically. |
Unit Price | Price per cost unit (based on the SSB). | Filled in automatically. |
Total Cost | (Automatic) The result of Volume x Unit Price. | Filled in automatically. |
Status | For the bi-weekly Review (To Do, In Progress, Done). | Click the dropdown and update the status during the Sprint review. |
Act | Delete row button. | Click (x) to delete the task. |
Quick Tip: Always check the Vol and Budget Component columns to make sure the costs calculated by the AI match your real needs.
B. Project Roles & Competencies
This table is compiled automatically by the AI based on all the tasks in the Work Plan.
- Project Role: The proposed role (e.g., Chief Digital Officer, Theology Commission Coordinator).
- Duties & Responsibilities: The main duties of the role.
- Required Skills & Competencies: The expertise required of the person filling the role.
Usefulness: This table greatly helps the BPH and the GBM to identify and recruit or assign the right people for each strategic initiative.
💾 Step 3: Export Data (Report)
Once you are satisfied with the Work Plan and have made the necessary corrections:
- Click the large green button: DOWNLOAD EXCEL (XLSX)
- The Excel file will be downloaded to your computer.
- This Excel file has two Sheets (Worksheets):
- Sheet 1: Agile Work Plan (Work Plan and Budget Table)
- Sheet 2: Project Roles & Competencies (Roles and Skills Table)
You can open this .xlsx file directly in Microsoft Excel or upload it to Google Sheets for further team collaboration.